Initially, the Jai Hind metro station was prepared to be elevated. Nevertheless, the AAI objected which the elevated extend up to the airport may well pose a menace to plane, so the route was additional reworked and also the station was shifted underground, 150 m through the Airport terminal creating. If https://railwaykolkata23444.izrablog.com/32801877/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf